Select your language

"What your world is
we can build it"

Cost of Building Permit

For the issuance of the building permit, the cost of the studies is 100€/m² and the supervision is 50€/m², total cost 150€/m².

Cost of Building Permit



For the issuance of the building permit, the cost of the studies is 100€/m² and the supervision is 50€/m², total cost 150€/m².

1st example

Issuance of a building permit for a 120 m² building
Studies: 120 m² * 100 €/m² = 12,000 €
Supervision: 120 m² * 50 €/m² = 6,000 €
TOTAL = 18,000 €

2nd example

Issuance of a building permit for a 120 m² building with a 60 m² basement
The basement corresponds to 1/3 of the cost of housing (60 /3= 20 m² of housing)
Studies: (120 m²+ 20 m²) * 100 €/m² = 14,000 €
Supervision: (120 m² +20 m²) * 50 €/m² = 7,000 €
TOTAL = 21,000 €

The cost of the building permit includes the studies, the cost of supervision, the cost of preparing the Energy Performance of the Building (KENAK) except for the expenses-contributions (VAT, taxes, funds, etc.) that will be required before the issuance of the building permit. The basements and semi-outdoor spaces participate in the cost with approximately 1/3 of their surface area and burden the above price.

Building permit – What is required

a) application of the owner or the person having a legal right with the assignment-assumption declarations,
b) approvals of other services and administrative bodies, where required,
c) title deeds, recent certificate of ownership or cadastral sheet and extract of cadastral diagram for each property,
d) proof of legality of any existing buildings,
e) architectural study, which includes the passive fire protection study and the accessibility study for people with disabilities, where required,
f) static study,
g) electromechanical installations studies,
h) building energy performance study,
i) project execution time schedule study,
j) study of plumbing installations and sewerage,
k) active fire protection study,
l) gas fuel study approved by the competent gas supply company,
m) project safety and health plan and file,
n) waste management data (WMD),
o) notarial declaration of the envisaged parking spaces,
p) explanatory report,
q) proof of deposit of the required contributions of the project owner to the State, EFKA and municipality,
r) copy of proof of service provision or invoice relating to the payment of the agreed fee of the design engineers, as well as the Engineers' Income Tax (EIT) thereof.
s) topographic diagram,
t) coverage diagram,
u) in case of redemption, submission of a contribution form is required.

0% PRE-PAYMENT

0%
PRE-PAYMENT

WE ARE CERTIFIED WITH EN ISO 9001:2015

WE ARE CERTIFIED WITH
EN ISO 9001:2015

CLOSED BUDGET

CLOSED
BUDGET

15 YEARS GUARANTEE

15 YEARS
GUARANTEE

INSURANCE OF OUR WORK FROM US

INSURANCE OF
OUR WORK FROM US

ANALYTICAL CONTRACT WITH TIMETABLE

ANALYTICAL CONTRACT
WITH TIMETABLE

They said about us

arrow-left
arrow-right
Professionalism, consistency, quality. Dear Mr. Costas Fragakis and Mr. Giannis Fragakis, architects and engineers, owners of the company, always by our side to explain any question and provide solutions, we thank them very much!!!
Triantafylloy
Positive human presence,Professionalism
Excellent knowledge and quality
Fast issuance of permit and completion of the project.
Freedom of choice to buy products independently, without commitment to their own partners.
The best choice I made..
Katerina Koukouvitaki
Perfect professionals with respect and love for their work, and this is why the result they deliver is excellent. I recommend the company unreservedly and I hope that they will continue with the same passion!!!
Triantafyllos Baltzis
× Images